  • 2 steps forward, 2 steps back

    Having struggled to the house through the snowpocolypse a couple of times, in true PNW style, it’s rained and the snow is mostly gone. What’s left is a reminder of just how filthy internal combustion engine vehicles are, with a layer of dirty soot covering the white frozen remnants at the side of the road.

    Our trips to the house have yielded some significant progress on some of the most complex bits of plasterboard in the house. Unlike most builders we have not simply cut a hole in the roof with a tube down to the ceiling. Oh no. That would be faaaar too simple. No, ours is a funky shape with the ceiling the bare minimum thickness that’ll allow us to keep the R-48 requirement betwixt ceiling and underside of the roof vents. It slopes back at a not-quite horizontal angle (why would you want horizontal), and allows light to flood into the corridor. At least, that’s the theory.

    It also carries the ‘letterbox opening’ theme which we’ve carried around the house from the front windows to some of the storage… There’s architecture hiding in our little box. At least, in our heads, there is.

    Anyhow, so we’ve completed one of them and the other is about half done.

    IMG_20190217_123416
    There’s some finessing to do with a rasp along the edge, but otherwise it’s looking pretty nifty

    The really nice thing about this is how much we have come to like the place we’re building. Both of us have separately commented on how we enjoy the light, and the space, and the general feel of the building. The time we’ve spent finiking with the design has made a place we both enjoy being in. When we’re not itching from the exposed glassfibre / mineral wool.

    We’ve switched from skylights back to doing bedrooms, though, because having started with, we thought, 4 extra boards we’re now down to the wire on boards. More so after our frankly disastrous day today.

    See, we had the board cut. So we thought. We’d cut it back at the beginning of this odyssey, when we first discovered the lift wouldn’t reach the ceiling. We had, however, put up the thin strip up that it’s meant to mate against. At least, so we thought.

    Cue the struggle that is getting a near 12′, 60kg, floppy and fragile board onto a lift that is about 4′ in the air, in a room that is only half an inch longer than the board is.

    After much shuffling of the lift, the two scaffolds, the bench and a folding chair it was up. Aaaand, about half way up we realised it was maaarginally too long. Like, a few mil needed to come off each end. After some debate we concluded that we’d shave off a few mill just where the studs were on the exterior wall end, and just where it was touching a stud that’s marginally further out on the wall we built.

    Down

    Up

    Down

    Up

    Finally with some shoving and tweaking we got it lined up along the bottom edge. We got it most of the way up and concluded that it looked pretty good…

    …and so we put the glue on it and up it went…

    …at which point we realised that it didn’t fit. I mean, it fits side to side, and the bottom edge lined up just dandily. The top edge, where it was meant to meet our thin-strip-of-correction…not so much.

    It met in the middle. It was not-awful in the middle. I mean, it wasn’t great, but we could probably have got away with it.

    But at the south end the gap became about 1/2 an inch…and at the truly abysmal north end, it overlapped by probably more than an inch. There was some panicked debate. The thing had some screws in already – part of a technique we’ve developed for getting the damn things aligned when we have neither the strength nor the number of people traditionally required for this kind of affair.

    It had glue that was already drying.

    We both felt totally demoralised by going from “we’re going to have our first room with a finished ceiling where we can move onto the walls” to “oh, shit, at least part of this needs to come down”.

    We started by backing off the board a bit and taking down part of the thin-strip-of-correction. But after some more looking at how terrible things were Kathryn voiced it and I agreed. It’s got to come back down.

    Defeat poured over us as we winched the bloody board down from the ceiling.

    It’s not really the board’s fault. Early on we had a bad day. A really f’kin bad day. One of those days where you wonder why in hell you’ve put yourself in this situation and wonder whether any of it is worth it (there are always days like this, it seems). You curse every rotten strand of xylem and phloem that make up the timber that you’re inexpertly wielding.

    /PHOTO_20180212_151846

    On this a’cursed day, we were putting up the short section of wall that goes over the master-bathroom door. And nothing, just nothing went right. It was too heavy and unwieldy. We hadn’t realised how unsquare the house is and the measurements we’d made beforehand so I could make the parts – or the parts I’d made – one of them wasn’t right. It wouldn’t line up the way we wanted. It didn’t sit square with anything we tried. We knew it wasn’t right.

    We should have taken it down.

    We didn’t.

    We thought it would be okay… that we could kind of hodge it and bodge it and make it work… but it has come back to haunt us.

    The lounge side we’ve come up with a fix for, but this bedroom side?

    https://www.flickr.com/photos/49965961@N00/32200398137/in/album-72157686228466864/

    Well, the widths are all over the shop.

    We lose a full inch (2.5cm) across that last 4′ (2.1m) run over the door. Part of that is that the house gets narrower at the end and we didn’t take enough account of it earlier. Part of it is that the roof is not exactly centered over the house, and part of it is that we fucked up.

    It is going to be 18 different kinds of nightmare to make something that lies like a sufficiently fringed Persian rug and makes it look straight. We’re going to have to have to make things mate…with curves…and angles…and trying to make things look like they are a constant width…when they’re not.

    Which is miserable enough in itself, but taking it all down and staring at it today? That truly sucked.

    I am trying (we are both trying) to look on this as a learning experience and with more equanimity than some previous issues. I think we’re both doing better… it’s a sod. No doubt it was very, very disappointing. And it <em>is</em> going to be a pig to sort it out. <em>But</em> we have got better at this than when we started. It is within our capabilities to make this right.

  • Sneh

    The average snow-fall in Olympia is 12″ (~30cm).

    Over an entire year.

    Over the last week, outside our house we had about 8″ (~20cm) (which we cleared from our drive), then a day later another 12″ – and then another ~4″ (~10cm)…in the 2 hours after we cleaned off the 12″. The road outside our rental has been more or less impassable unless you have a large vehicle with 4 wheel drive… probably with chains on. Or real winter tyres.

    Being a tiny little road, while it isn’t a private road, it doesn’t even manage to make it onto Olympia’s “we’ll plough this when we get round to it” list.

    IMG_20190211_132302
    (more…)
  • As usual, our timing is off.

    So we’re trundling along with the drywalling of the ceiling, still. It’s getting closer:

    IMG_20190204_152208
    Just the irritating narrow strip at this end, and the skylights, oh and….
    IMG_20190204_170933

    We’ve actually got about 8′ of completed ceiling on one side of the house which is super exciting. We’re going to go and try and put up some more this afternoon – and once we’re done with that, we’ve got some super fun bits in the shape of the skylights.

    They are a bit of a nightmare approaching, but what can you do, other than, I suppose, not design your house to be a billion angular nightmares in one.

    But it’s definitely getting there. We’ve still got a small bit of ceiling in the main loft space, and all of the tiny bonus loft space above the laundry to do. Once that’s all done we can move on to walls.

    But our timing is off. Because if we were a month further along we might be at the point of having, say, flooring down. With heating in. Which would be good, because the temperature here has dropped to -8C (~17F). Which means that our poor little oil filled radiators are working flat out to keep the house warm.

    In fact, I was just pondering as I was sat at home, that we are actually maxing out the circuit two of them are on (as there are only 2 live circuits in the house) – so I’ll have to revisit that when we get to the house. I’m trying to think if there’s another circuit I could make live.

    But it was 11 C in the house yesterday, which “isn’t enough”. Well, it’s enough, but not comfortable to work in.

    It is impressive that two small oil filled radiators are keeping that house at 11C, but… yeah, I’m going to have to revisit that and see if I can sort out a third circuit. I think the hall outlets are independent of the rest, and so I’d only have to blank off one outlet to make that live.

  • Unduly positive

    We have spent the last week getting a 6 3/8″ wide strip of drywall attached to our ceiling. Why? Well, because we’re insane. And rather than accept splitting the house perfectly down the middle (which would have been relatively easy), we instead made it so the ‘great room’ (Lounge, kitchen, dining room) has the peak and about 7 inches of the other side of the slope of the roof. The bedrooms, in turn, stop just short of the peak.

    This seemed like a fabulous idea at the time. That time before we really understood what a nightmare an unsquare building was, and how incredibly heavy plasterboard is, and, obviously, the limitations of our abilities.

    So, cue much research, discovery of Straitflex’s X-Crack (which allows for uneven framing and helps reduce the risk of cracks at the top of cathedral ceilings). And then cue a solid week of finicking, making shims, working within the bounds of our design to try and bridge the problem areas.

    And after a solid week, and some rather painful holding up heavy things at awkward angles…

    IMG_20190128_151827

    We are both, I think, honestly amazed at how good it is. And how level it is. Of course, just to make things more tricky because the wall is parallel to the other walls – it’s not straight along the ceiling. So the pitch of the slope changes slightly, which meant we spent a cheery hour yesterday working out how to adjust for *that*.

    But it’s done. I think.

    I’m off momentarily to start cutting the shims for that.

    But despite the frigging nightmareishness of it all, and the fact that while we do have an extension for our drywall lift it now means that we have to get the damn drywall up 18″ higher than we used to. Which is higher, I think, that either of us can easily lift it, it actually all feels doable again.

    We sat down and calculated the drywall requirements for the walls in the other rooms.

    I also – because I was feeling astonishingly positive (and the sun is out) actually washed the Rav:

    IMG_20190129_103402
    Yes, it really is ours. I know it’s normally more moss-covered than that…

    Which looks pleasingly shiny. At least for a few hours :)

    Still need to clean the inside, but it’s a step forwards.

  • Well, bother. Again.

    We wanted to rent a nicer lift – because our lift doesn’t reach the heady heights of the peak of our ceiling. And so we looked at the local rental place that claimed that they had one. And then I called them. And it turns out they don’t.

    They don’t think anyone else local has one either – although apparently some places have the same shoddy lift we have with the extender. Given that isn’t really an improvement, we forked out for the 18″ extension for ours. That is a frankly terrifying almost certainly badly welded object consisting of a pipe with a bit of metal rod sticking out of it. I’m assuming. It’s not arrived yet.

    your orders
    I very much doubt ours will look this nice when it arrives

    Of course, the problem with this is that it means that we have to raise the 12′ sheets of drywall up an extra 18″ to get them onto the lift. Which means, I suspect, a fun game involving a step stool and a giant heavy sheet of drywall. Fortunately, I think that we only have 5 sheets to do.

    While we’re waiting we’ve been doing the bodgy bit – making the altered-pitch bit at the peak of the ceiling that covers for the fact that we didn’t manage to get the top-plates at the top of the wall perfectly aligned all the way along. I sometimes wonder if we should have done them differently, but I’ve absolutely no idea how we could have got it better. At any rate, we think we’ve come up with a method which should allow for the flexibility of cathedral ceilings, keeps the ceiling looking right, and doesn’t lose too much height. I also think we have just got enough of the x-crack (which is the stuff we use for the joins between the changes in angle sections of the ceiling, because you’re meant to use something that allows a little movement).

    We have also ordered some super-duper-posh corner stuff for the corners of the wall, which I think is made by the same company.

    And after Kathryn cut the 4″ strips of 3/4″ ply to go around the edges of the wall, I’ve been working my way around the edge of the house laying that and trying to work out pipe-routing around some of the more complex bits. Most of it was done for us, but there’s some quirks to our heating-system-manufacturer supplied PEX plan… like it going through walls. And there’s also some changes we made – like not having the heating under the bath (because the bath had to go in before the heating), and changing the cupboard layout by the front door…

    All of which means it’s not exactly a straight transfer from their map onto the floor, and there’s quite a lot of concentrating and staring at things to work out where the pipes will run. I’ve done the space where we’ll have a bench and the cupboard next to the front door – both of which were very fiddly bits. There’s the two bathrooms to do next, but we don’t have any more 3/4″ ply.

    In other news, the place we were going to get our wall finish material… has closed… both of its West Coast operations. So we’ll have to find a different dealer – but it’s a shame because our friend recommended it as a good resource for eco-friendly building materials.

    But in good news, we managed to score bathroom wall tile for ~$1/sq foot. I’m sure, like last time I used B&Q cheap tile, it’ll be a nightmare to install. But pulling random ones out of the box, they looked fairly square and uniform. And I’m much more used to tiling than I was back then, so hopeeeefully, it should be okay. It’s nothing exciting, just white subway-stile 3″x6″ rectangles. Not the really nice bevelled ones. Just plain. But they look okay…

    We just need to get to the point where we can put them up.

  • Well, it’s 2019.

    So I can’t say that I’m entering 2019 full of hope. I’m hoping that it’s less miserable than 2018 was. I normally do a year in review; but the beginning of 2018 I think I more or less skipped it, 2017 having been so much of a car-crash.

    2018 hasn’t been a lot better. I mean, it has in that by changing job I managed to pull myself out of the pit of burn-out and depression that I’d spent so much of 2017 in. I’m not going to rehash the awful political situation, and I’ve spoken enough about how unsafe I feel outside Olympia thanks to the rampant white supremacism, bigotry, and the insane availability of guns. I don’t feel we really need to rehash that. Politically? Socially? 2018 – in a nutshell – sucked.

    But 2018 has also run by in a blur of missed deadlines and frustration over the house. A frustration which has, unsurprisingly, spilled over into 2019 as we wonder when the house might, just possibly, be finished. And how we’re going to get to that finish line. The list of jobs is both much more managable and simultaneously, so massive as to be terrifying. Partly because while I can start work on the floor in some areas, much of the work that’s left to do requires two people. And that is kinda restrictive.

    There’s still the exterior work to finish, which is at least partially single-person-doable, except that… we have no on-site storage except the house. And for the exterior stuff we need wood; lots of it. So that puts somewhat of a crimp in that. And the move-in readiness stuff? That’s mostly two people for the forseeable. Which is fine. Which we’d talked about. But right now it feels kind of overwhelming.

    Part of this is, no doubt, that I’ve just got back from CES. And that was an all encompassing, all consuming event. We filmed, we talked about filming, we planned filming, and then we (well, Nikki) edited late into the night. We ate, drank and slept CES. And coming back to the real world after that kind of event is actually kind of strange. I’d not really thought about the house – or the mortage+rent situation. I’d not really thought about the complexities of the things that need to happen.

    IMG_20190108_172738

    CES, incidentally, was a blast this year. Last year it was a hard slog. This year it was hard, but we actually properly had fun, we knew a bit more what we were doing, and some of my stuff in front of the camera felt more – well, I felt better about it. I still need to get better at interjecting when I have something today. But that’s on me.

    And the road-trip turned out to be exhausting but awe inspiring. We crossed the high desert, we went up and down mountains, we drove through cities and towns and near deserted villages. We saw tumble-down houses and massive skyscrapers.

    TBH, it was really cool.

    IMG_20190113_110206

    Granted, I could have done without the 3am arrival at Las Vegas, and the 2am arrival back in Portland. But – all of that was done in an EV, fully laden, with essentially an entire studio.

    And that whole thing really cements the functionality of EVs. More charging stations would have made life a ton easier. But it’s doable now.

    But having arrived at home? Suddenly, all that real world stuff is back.

    Bills – distressingly large ones – have arrived. And the phone call this morning – in the middle of my yoga routine (and I rarely give myself time for yoga, so: Really world? Really?) – from the garage that has my minor – saying that they have not really managed to come up with a solution to the missing / mismatched parts and they’d like to look at shipping her off to a different garage… and I’m left suggesting that I’ll call JLH back in England and beg them to send as many bits as they can think of that might fit and I’ll pay for shipping them back…

    Well, it’s disrupted a fragile equilibrium.

    Or, to put it another way, has left me feeling quite shit.

  • Hey, is that a weird cube in your kitchen or are you just pleased to see me?

    Okay.  So after much cursing, poking, peeking, and prodding. Also after hitting it with a hammer and something that was definitely not a screwdriver being used as a sort of chisel. And spraying it with lubricant… the lift seems to be working again.

    However, because it wasn’t working we planned other things. Namely walls. And we got stuff to do them. And now we have a delightfully weird cube butting out into our kitchen. This was expected, but actually encountering it is quite different to “we’ll have a cube sticking out into our kitchen when we’re done”. 

    It’s quite fun, and very angular. We, it seems, have all the angles.

    IMG_20181213_164814
    Many angles. Some of them are quite close to 90 degrees. Not many, though.

    We’re almost all the way round the bathroom cube, then there’s many cupboards to attack. Well, one and a ‘sitting to put shoes on’ space, and one that I was a teeny bit short on when I was using up spare drywall. We’ll probably go back to me attacking cupboards, and Kathryn and I attacking ceilings now that the lift at least appears to be working. 

    We stood around today at the end of the day talking about the cube. It’s very odd. We built this. On the exterior walls – so in every other space in the house – there’s some of the original house hiding. It may be patched, it may be modified, but it’s there. But the main bathroom has no walls that existed before we came. It even mainly stands on a sub-subfloor that we put in because the old floor was so rotten. There is no part of it not built by our hands.

    IMG_20181213_164844
    Look, more angles.

    From the plywood subfloor, to the studs, to the ceiling joists, to the ducting, to the heating, to the plumbing, to the cast iron bath, to the electrics, to the drywall. It is our sweat, tears, time and effort that have made that little space exist.

    It’s quite cool.

    Also, angles.

  • And it’s broken, again.

    So, today we were hoping to put up at least one of the final 3 pieces of plasterboard that make up the bottom two rows of our plasterboard ceiling in the lounge. That would be the end of the ceiling bits that we’d be lifting with our drywall lift – and then it’d be time to break out the rental lift.

    But no, because our Arksen drywall lift has broken again. Now it’s just incredibly stiff to the point that we can’t lift it beyond about 8 feet with any load on it. I’m not sure if something bent, or if it’s just stiff because it has mating surfaces which are just bent metal against bent metal. At any rate, having loaded the drywall we got it to flat-ceiling height and could go no further. After several attempts to work out what was up we concluded that it’s b0rked and we can’t see where. I may try spraying some oil on it, but I suspect that it’s bent in a bit that you can’t easily get to without dismantling it, although I’m unclear how – or when – this happened. Also, I’m currently unclear whether it’s dismantleable without cutting welds. It’s hard to say when it broke because the last 3 pieces have been smaller bits that only went up to normal ceiling height on a flat ceiling, so it’s unclear what could have broken it.

    IMG_20181204_094646

    So it looks like we need to rent the posh lift, which is all very well but for the fact that I’m away for a bit in January at CES and there’s Christmas – which makes renting the lift for four weeks (which is the cheapest way to rent it for the amount of time we’ll need it) impractical; or at least wasteful. Which means that we’re not going to get back to ceiling work until after Christmas. Which is distressing.

    It’s not like there’s not lots to do. But we can’t get the 12′ sheets up without a functioning lift, which means we can only do a few bits of the walls that require 8′ sheets – which restricts our choice. And again, it’s not like there’s not lots to do. It’s not like this actually really slows us down (apart from the half day we’ve lost today) but it’s irritating to have our plans thrown. And it’s more irritating because this piece of kit has cost us in time and money (although at the moment we’re out $40, which is a lot less than it’d cost for us to rent a lift for as long as we’ve had this one).

    Thankfully, today wasn’t a total washout. This morning was spent working on the radiator in the bathroom. We’re tapping into the underfloor circuit (at the manifold) to feed radiant towel warmers in both bathrooms. This will involve fun with adjusting valves to get a sensible rate of flow through both circuits, I suspect. At any rate, I cut the channels in the floor (through our underlay-layer of subfloor) and laid the pipe run to the 3/4 bathroom. Then I broke out the insulation and stuffed the wall with it. It’s not pretty because this wall was built 1′ on centre (rather than 16″ on centre), so I had to chop the insulation up to get it in (I could have cut one long run, but that ends up being very wasteful). You can see the pipe run on the floor there, too, with my high-tech solution to protect the pipes.

    IMG_20181204_122748

    I’ve also started insulating the main bathroom, but I need to do the same trick of running some pipe in there, which means whacking some more screws in the floor before hand, and deciding on a pipe run. Fun, fun. Well, dusty, then itchy.

    I keep having these thoughts about when we might actually get to move in. Sometimes it seems like it might be tolerably close. Sometimes it seems infinitely far away.

  • You may find yourself endlessly trimming a piece of drywall…

    …and you may ask yourself, “How did I get here?”
    (…and you may tell yourself, “This is not my beautiful house”)

    We finally, finally got the corridor done. All four pieces of drywall are up and fit…sufficiently well. There’s going to be some patching, some tape-and-joint compound to cover miscuts and a joint that is pretty shonky. Since we’re skimming the whole damn lot we’re hoping it will be okay, but it turned out to be all the nightmares at once.

    At first glance, it doesn’t look that bad…

    IMG_20181202_133307

    I mean, we got the first board up and apart from cutting around the light fitting that, it turned out, was just caught, not actually in need of a cut-out, it went fine. Well, it took a few goes because our hall is hilariously unsquare.

    Things we have learned are that unlike building in brick with plaster over the top it’s better to have a straight wall with a nice 90 degree angle on it and suffer the fact it doesn’t look right somewhere than to try and average out the errors across the house. Our house is a non-parallelogram. It’s made of curvy sides attached at corners that approximate 90 degrees. The floor is unlevel, rising half an inch to the door across a span of about 1 meter. It’s all insane. And we made many compromises to try to make it look kind-of-right. And those are biting us at every turn, because things that should be flat often have a bit of a slope. And it turns out a lot of building materials come in flat and rectangular forms.

    So our hall is not square, and yeah… it has been trouble. Despite that thet first board went up yesterday morning without too much pain.

    Then we tried to make the second board.

    We tried every trick in the book. It was cut slightly overlarge, then scribed to fit the shape. We measured at multiple points. But having put it up-and-down probably 10 times (please recall, these things are f’kin heavy and yet fragile), it still didn’t fit at the end of the day, and it became apparent that it was still far enough out that it wasn’t realistically going to happen without disintegrating. We ended up putting it down and coming home – which was deeply disheartening as it meant that in a day we’d put up one board that’s just under 2 ft wide.

    Still; Today we took the challenge up again, and took many more measurements, then hacked off more board, cut off the corner that had been damaged in it’s 800 cycles of raise-and-lower on our shoddy-ass-wavy-wobbly lift, and finally managed to get it in place. I cut the light hole pretty well, then munged the smoke-detector hole. But it’s patchable (which is becoming a mantra).

    Kathryn put pretty much all of the many, many screws that hold it up (despite our book saying that if you use glue you don’t need so many screws, that isn’t something that we’ve confirmed with Oly – and frankly, on ceilings, I like them to be screwed in place).

    And then we cut the final piece of corridor board, and put that up. The light hole in that one is okay, and the fit along the edges isn’t terrible.

    All in all, the corridor is probably adequate. No picture, because it was dark by the time we’d finished, not because I’m afeared to show it. I’ll take a pic tomorrow :)

    The good thing is we’ve now cleared enough floor space that we can do the final 3 pieces of ceiling we can do with our drywall lift in the living room area. We’d got the bottom two sections up along the rest of the ceiling:

    IMG_20181202_133325

    and it’s just the bit above the lounge which until now has had a big stack of drywall covering the floor. Now there are just two sheets – so we can move one, and the other one goes up on the ceiling, then that one we’ve moved will get put up.

    I’ve also started work on the heating plumbing, some of which has to ‘sneak’ into the walls to run to the radiators in the bathrooms, and that has to happen before we can drywall the other side of the walls (we’ve done one side of them already). Then all those interior walls need insulation, the exterior ones need special little blocks for the drywall to screw to (because our floor is 3/4″ higher than the old floor) – and then they can all be drywalled.

    The fun with drywall never ends.

    Yes, yes, I know, I’m whingy. But as we inch closer to a house that’s liveable, it’s increasingly painful to not be in it.

  • More plasterboard, more fibreglass… and more rooms.

    So last time I wrote about the bathrooms I’d forgotten about the shelf that was meant to be in the 3/4 bath. We’d forgotten about it when putting up the cement board, and also hadn’t added in the framing for it. It’s just one piece of wood, in this case, so adding it in after the fact was pretty easy since we’d only done the bathroom side; cutting out the cement board wasn’t too painful either (although I think the roto-zip has suffered from cutting cement board – I think I should probably put in a new bit). I had to wait until we’d done the other bathroom to find out what left-over bits were left for making the sides – which, now I’ve finished the other bathroom, I got to do…

    Yes… we have two completely walled bathrooms!

    IMG_20181126_153251

    IMG_20181126_144527

    As has been one of the most enjoyable things throughout this process, the building has changed again. It’s fascinating the way it feels bigger or smaller, and the way the light changes… The gradual addition of plasterboard walls to our framing changes the space in a new way. It’s been a case of having to try and imagine the walls and how the light will be, and now we’re getting to see the walls and the light. It’s interesting in a way that I’d not considered; because while we’ve changed one or two rooms in a house before, we’ve never changed anything so wholesale as the entire structure.

    IMG_20181127_102854

    And it’s starting to feel more like a house again, which is interesting. Adding the insulation was the last big change to the feel, with the road suddenly becoming much less audible. Adding in the new front door when we get it should really quieten things down too, because the current one fits so very badly. Unfortunately, it’s rained and rained and rained, which makes going to get a new door somewhat tricky.

    Anyhow, today I set to on the next section of the plasterboarding odyssey. The pantry and the laundry. Much up-and-down with plasterboard later, and we have a completed pantry (at least the walls-of).

    IMG_20181127_122833

    It is the world’s smallest pantry (about 30cm wall-to-wall), and we’ll have to either make or get someone to make a really narrow pull-out set of shelves. It may need some kind of bumper thing to prevent it from destroying the wall, because otherwise it’ll probably shred the plaster. But it is possible to get in there, which means that we should be able to tape and plaster it.

    I’ve also made fairly significant progress on the laundry – with two of the walls plasterboarded. I did screw up one section up – unfortunately. I couldn’t use the roto-zip on the sockets in there because that circuit is live and has actual outlets screwed in. It also made using the magnetic blind socket finder less accurate (because the board couldn’t be positioned in it’s proper place – ending up much further from the wall than is ideal).

    Unfortunately, the first board I cut for the lower section ended up disintegrating around the socket because I hadn’t quite cut the hole in the right place. It was close enough that it looked like it would fit – but as I lifted it a little to put screws in, it caught and then cracked around the socket. I whipped that one off and recut it, but ignored an earlier smaller error – the light switch has a somewhat large hole, which we’ll have to repair. I also stuffed offcuts of insulation (what I’ve been referring to as ‘scruff’) in the wall in between the laundry and the pantry. There are some slightly bigger bits which I’m hoping will be easier to use in the wall between the bathroom and the laundry – but that’s always going to be a less well insulated wall (because of the shelf – and because it’s full of plumbing). So that’s tomorrow’s tasks… and then I’ll start laying the pipe routing channels in those rooms for the heating.

    I’m thinking I’ll use the left over mould-proof bits in the central-heating boiler room, since that’s also got the water supply in it too. At any rate, it’s all quite exciting.