We put in a solid 16.5 hours this weekend on the house. And what did we do?

/PHOTO_20180513_173104

Well, the two front windows, the last two original windows? They came out. We’d left them for a while for various reasons. One is that we don’t like having the front boarded up, but another is that one of them (the one nearest the car) is 8ft long and the other is 6ft long. We’d removed a 6ft one earlier and it was a complete pig, so we weren’t hugely looking forward to this.

Fortunately, the 8ft one was broken (our contractors broke it) so we tackled that first knowing we could chop it up to pull it out. It turned out, however, that the joker who installed it had used whatever s/he had lying around to install it. Y’know, a couple of drywall screws, a few nails here and there. The end of a tube of caulk.

In fact, it was so badly installed that we had more difficulty getting it out because it half fell out part way through. It was hanging by a couple of nails… In the end we put a tarp on the ground, Kathryn pulled the nails and sort of let slide-fall onto the tarp where it shattered.

/PHOTO_20180519_104057

Fortunately, the contractors had stuck a sheet of plastic across the front of it to stop it falling apart when they broke it, which stopped most of the glass exploding out across the garden.

We then ripped out a big chunk of manky old wall…

/PHOTO_20180519_132147

Framed up for our new (much smaller) window

/PHOTO_20180519_154347

Made a little strip of ply to fill in the enormous gap in the siding left by the original builders… (which had been filled with spider nests and dead insects when we stripped the trim off)

IMG_20180519_163501

(Over a roughly 6ft span that goes from 1.5 inches to less than 1/8th of an inch). Did these people not have a f’kin plumb bob?

And as the day wore to a close we put the siding up (we’ll cut out the window after the framing’s approved).

/PHOTO_20180519_185830

Sunday was a rinse and repeat:

/PHOTO_20180520_125453

Only in this case they had barely installed the window. It came out almost pristine. The few nails that were holding it in were mainly the ones in the trim. Oh and 2 drywall screws and a 2 wood screws that were about 20mm long.

There was also some caulk – about 20cm of it along the top edge of trim…holding the trim to the window. After Kathryn pulled some of the trim off it became rapidly apparent that we’d have to hold it in while she pulled off the rest, because it was so loose. It actually threw us both for a bit, because less than an hour after we got there we’d removed the window and weren’t mentally ready for “now we need to demo the wall”.

This one was tricker because we had to replace the header – our plans require two jack studs either side of the header (rather than one on the original header), so even though our new window is the same size as the old window (although approximately 30cm further north than the old window), we needed to pull the old header to install a longer one.

But after quite a lot of experimentation with methods on previous windows we got this one in smoothly. Albeit with some beating it with a hammer and a block of wood to get it in the last few mm (it was pretty snug).

And ended the day with the front boarded up.

So quick shower this morning a few nails (we didn’t do all the siding nails yesterday), and I’ll call for an inspection on that. Then we can wrap the front, put in the last two windows…and commence making the rainscreen.

Also, obviously, there’s the interior electrics to do, and the drywall, and the flooring, and the heating… and and and.