Yet more copper

Comments Off on Yet more copper

So, we continued our plan to put all of the copper in the world in our house. At least, it somewhat feels that way. We’ve used way more than I guestimated based on the book – which says you’ll need N rolls of W, X, Y and Z gauges for a medium size house. I thought, given our house’s smallness that we’d need much less. Turns out that we’ve needed about 2/3rds as much.

Part of that is that I like to break off rooms into separate circuits – and break off lighting and sockets into separate circuits.

Part of it is that we’ve tended to route things the “gold standard” way (over the top of windows, rather than under them).

Anyhow, today we worked on it some more… it was very hot out and the idea of putting up rainscreen even in the shade on such a hot day was pretty unappealing. As I’ve whinged before, the project’s not exactly going fast, and I’m hoping that when we do (hopefully) get the permit signed off and can start insulating and drywalling (plasterboarding) that we might get that going a bit quicker.

We still have the ply to put down on the floor – along with the heating pipes – which needs to be done before we can start faffing around with walls. And we’re starting to really struggle with all the crap in the house. Offcuts of wood that are potentially useful. Offcuts of wood that we’re thinking of using for firewood. Offcuts of ply that might be handy. Offcuts of ply that are probably scrap, but irritatingly large and thus kept around. The beams we got because I f’cked up and bought an extra beam – which turned out to be handy, because we f’cked up and cut it to the wrong length and which we might use in the garage…

The gardening stuff…

It’s all got to go somewhere. And that means a shed, realistically. Because while I’d love to throw the garage up, we aren’t in a position to do that really. We’re thinking of giving in and getting some nasty brackets with a cut list, then throwing a shed up (hopefully in a couple of days) – just because it would make things much more managable.

But that means probably spending money on an excavator rental, or hand digging a large hole. One is costly in money, the other in time we don’t have.

Which we could probably complain about more, but for the fact that we’ve booked a holiday – 8 days away from this madness. Which – despite the loss of 2 weekends, and a solid week of work – is I think needed to keep us at least slightly sane.

KateWE

Kate's a human mostly built out of spite and overcoming transphobia-racism-and-other-bullshit. Although increasingly right-wing bigots would say otherwise. So she's either a human or a lizard in disguise sent to destroy all of humanity. Either way, it's all good.